Lai Mun's
Portfolio
BUILDING SERVICES (BLD 60903 / ARC 2423)
Project 1 - Application of Building Services
Introduction
Project 1 is an individual project to apply basic building services systems into semester 2 design project.
Tasks
This project is related back to the studio design project by students in semester 2 which relates to a domestic size building. Students are expedcted to demonstrate their understanding of building services by proposing and designing the most appropriate system for the building which include:
1.) electrical supply system
2.) cold water & hot water supply system
3.) sewerage and sanitary system
4.) drainage system
Therefore students are required to produce appropraite drawings and diagrams which include specifications, sysmbols, legends, images, texts, etc. to describe the planning and installation of all the building services. Additionally, students may also include specific clauses from the Uniform Building By-Law (UBBL) or other relevant Acts, Laws or guidelines which relate to the proposed systems into their presentation boards.
Product
Conclusion
Upon completion of this Project 1, I am glad to be able to identify relevant information related to water supply, liquid waste disposal, electrical supply and drainage system. I also gained skills in ways to decribe the planning of the building services within the total design and construction process. Finally, I am also able to describe the installation of building services within the total design and construction process.